Work on the new parador in Lerida, include: Building a 56 space car park built with walls and slabs of concrete, in certain areas, urbanization will be made with ceramic and concrete pavers.
The rehabilitation of the central courtyard, which will be covered with a structure with solar panels. The facades will be ventilated with new insulating elements and finishes that integrate the environment.
The comprehensive rehabilitation hostel begins with the demolition of roofs and existing slabs and replacing forged lightened where loads are minimized, on the covers metal trusses were placed using isolation of new innovation and finishes combine ceramic tile and cinz . 5 lifts of which one is panoramic were installed.